Tesla × SpaceX Advanced Technology Chip Fab — R&D precursor to Terafab (Terafab itself is the Grimes County plant) · Austin, TX (Giga Texas North Campus per Tesla; east of the vehicle factory)
Logic, memory & packaging R&D (AI chips for Tesla/SpaceX)
Updated 2026-10-29 · Satellite imagery 1/31/2024 · 8/11 milestones verified
Before
NowFirst and most-recent frames from the Sentinel-2 timelapse. Outline = construction footprint.
📍 Outline = the ATCF construction site east of the Giga Texas vehicle factory, south of Tesla Road (OpenStreetMap way 1553482280). Cross-checked against Sentinel-2: the rectangle is cleared by late May 2026, a bevel-cornered foundation appears by early July and slab work by late September — matching drone reports (Joe Tegtmeyer via Tom's Hardware) of a rectangular foundation extending south with beveled corners. Tesla's TDLR filing (TABS2026028764, 'Austin Semiconductor Fab') lists a 489,600 sq ft building. Tesla's own letters call it the research fab on the Giga Texas North Campus; drone pilots describe the same plot as the east campus. Re-checked 2026-10-29 against the 2026-10-22 Sentinel-2 frame. Base map imagery predates construction.
Latest: 2026-11-06 · Source: Sentinel-2 L2A (Copernicus)
Done
Done
Done
Done
Tesla Cybercab has crashed 8 times, and the data shows a speed problem
SpaceX catches the Starship to end Flight 15
Tesla Cybercab orders open at $29,990 and $299/mo, only in Robotaxi zones
Tesla Opens Cybercab Orders to 'Select Customers' at $29,990 Plus $299 per Month
Starship Flight 15 live
Write your own kernel optimiser
Get an email the day ATCF — Austin research fab gets a fresh satellite frame or a new permit filing. Free.