Advanced Technology Chip Fab (ATCF) — Tesla × SpaceX development fab · Austin, TX (Giga Texas main campus, east of the vehicle factory)
AI5 chip, 2nm process, Memory, Packaging
Updated 2026-09-27 · Satellite imagery 1/31/2024 · 6/8 milestones verified
Before
NowFirst and most-recent frames from the Sentinel-2 timelapse. Outline = construction footprint.
📍 Outline = the ATCF construction site east of the Giga Texas vehicle factory, south of Tesla Road (OpenStreetMap way 1553482280). Cross-checked against Sentinel-2: the rectangle is cleared by late May 2026, a bevel-cornered foundation appears by early July and slab work by late September — matching drone reports (Joe Tegtmeyer via Tom's Hardware) of a rectangular foundation extending south with beveled corners. Tesla's TDLR filing (TABS2026028764, 'Austin Semiconductor Fab') lists a 489,600 sq ft building. Base map imagery predates construction.
Latest: 2026-09-22 · Source: Sentinel-2 L2A (Copernicus)
Upcoming
Done
Done
Done
Done
Upcoming
Tesla bringing Cybercab, Optimus Gen 2 and free FSD test drives to the Paris Motor Show, Oct 12–18
Tesla's California VPP sets record: 85,774 Powerwall homes peak at 601 MW, deliver 932 MWh during Oct 6 grid event
I've just enabled Track Mode on a non-Performance Model Y Juniper. It's not that it doesn't work, it does! Not shipping it is a business decision.
Starbase Louisiana update 6-7-26
SpaceX credit risk jumps on worries over its borrowing spree
Did Tesla replace SpaceX thrusters with Electric Ducted Fans (Electric Fan Car patent)
Tesla FSD approved in Slovakia
California enacts MyFirstEV rebates and faster EV charger permitting
Get an email the day TERAFAB — Austin ATCF gets a fresh satellite frame or a new permit filing. Free.