Tesla × SpaceX chip production complex (Gibbons Creek, ex-coal plant site) · Grimes County, TX (SE of Gibbons Creek Reservoir, ~20 mi E of College Station)
AI5 chip, 2nm process
Updated 2026-09-27 · Satellite imagery 3/13/2023 · 4/6 milestones verified
Before
NowFirst and most-recent frames from the Sentinel-2 timelapse. Outline = construction footprint.
📍 Outline = phase-1 land clearing measured from Sentinel-2 on 2026-09-22 (~555 acres; a separate ~60-acre pad sits just south). It falls inside the area mapped as 'Terafab' on OpenStreetMap from drone footage and inside the 22,429-acre JETI project boundary SpaceX filed with the Texas Comptroller, and matches drone reports of phase 1 (of up to 10) on the western side of the site near Gibbons Creek Reservoir (Joe Tegtmeyer, 2026-08-23). SpaceX hasn't published building footprints; the outline will grow as clearing continues. Base map imagery predates the clearing.
Latest: 2026-09-22 · Source: Sentinel-2 L2A (Copernicus)
Upcoming
Upcoming
Done
Done
Done
Tesla bringing Cybercab, Optimus Gen 2 and free FSD test drives to the Paris Motor Show, Oct 12–18
Tesla's California VPP sets record: 85,774 Powerwall homes peak at 601 MW, deliver 932 MWh during Oct 6 grid event
I've just enabled Track Mode on a non-Performance Model Y Juniper. It's not that it doesn't work, it does! Not shipping it is a business decision.
Starbase Louisiana update 6-7-26
SpaceX credit risk jumps on worries over its borrowing spree
Did Tesla replace SpaceX thrusters with Electric Ducted Fans (Electric Fan Car patent)
Tesla FSD approved in Slovakia
California enacts MyFirstEV rebates and faster EV charger permitting
Get an email the day TERAFAB — Grimes County gets a fresh satellite frame or a new permit filing. Free.